Utilities and IPP Projects

Burrard Thermal Generating Station, BC Hydro
Burrard Thermal

Project Type: Thermal

Sequoia’s Role:
• Distributed control system implementation on 3- 150MW gas-fired thermal generators
• Control systems supervision, responsible for instrumentation, controls and protection
• DCS supply and engineering contract management
• Responsible for DCS system drawings generated automatically with InTools
• InTools database administration
• Commissioning

_________________________________________

Cheakamus Generating Station, BC Hydro
Cheakamus Generators

Project Type: Hydroelectric


Sequoia’s Role:
• Design of the protection, alarm and metering panel
• Supervisory interface panel



__________________________________

G. M. Shrum Generating Station,
BC Hydro
GMShrum

Project Type: Hydroelectric

Sequoia’s Role:
• Specification and installation instructions for a universal spare static exciter for BC Hydro’s largest generators
• Exciter replacement for eight 270 MW generators
• Governor replacement on five 270 MW generators
• Sequential event recorder
• Digital redundant speed sensing
• Air gap monitoring system
• Provided digital governor training course for electrical and protection control personnel
__________________________________

Marion Creek


Project Type: Hydroelectric

Sequoia’s Role:
• HMI and PLC programming
_______________________________________


Sutton Group


Project Type: Hydroelectric

Sequoia’s Role:
• HMI and PLC programming
__________________________________________


John Hart Generating Station, BC Hydro
John Hart

Project Type: Hydroelectric

Sequoia’s Role:
• Generators 1-6 control system upgrade
• Factory testing of protection and control panels
• 125VDC/24VDC station service upgrade

__________________________________________


Snoqualmie Generating Station, Puget Sound Energy
Snoqualmie

Project Type: Hydroelectric

Sequoia’s Role:
• Redevelopment/design of two vintage hydroelectric generating facilities; total of seven units and 52 MVA
• Senior electrical review and Engineer-of-record
• Specification review
• Protection design
• Grounding design

__________________________________________


Wahleach Generating Station, BC Hydro
Wahleach

Project Type: Hydroelectric

Sequoia’s Role:
• Design of the protection, alarm and metering panel
• Redesign of over-velocity detection system

__________________________________________


Buntzen Lake Generating Station, BC Hydro
Buntzen Lake

Project Type: Hydroelectric

Sequoia’s Role:
• Provided troubleshooting support for digital governor system
• Provided digital governor training course for electrical and protection control personnel


__________________________________________


Ladore Generating Station, BC Hydro
Ladore

Project Type: Hydroelectric

Sequoia’s Role:
• Design of the protection, alarm and metering panel
• Remote intake gate control over fibre
• Exciter replacement

__________________________________________


Ash River Generating Station, BC Hydro
Ash River

Project Type: Hydroelectric

Sequoia’s Role:
• Wireless communication feasibility study for intake gate

__________________________________________


Alouette Generating Station, BC Hydro

Project Type: Hydroelectric

Sequoia’s Role:
• Designed and commissioned remote adit gate control
__________________________________________


Waneta Generating Station, BC Hydro
Waneta

Project Type: Hydroelectric

Sequoia’s Role:
• Specification review

__________________________________________


Peace Canyon Generating Station, BC Hydro
Peace Canyon

Project Type: Hydroelectric

Sequoia’s Role:
• Specification and installation instructions for a universal spare static exciter
• Air gap monitoring system

__________________________________________


Seven Mile Generating Station, BC Hydro
Seven Mile GS

Project Type: Hydroelectric

Sequoia’s Role:
• Specification and installation instructions for a universal spare static exciter
• Dead bus synchronization/close control upgrade
• Control System Operation, Maintenance and Troubleshooting manuals
• Specification and project management for 230 kV SF6 GIS replacement
• Electrical/controls design improvements on a $65M dam safety project

__________________________________________


Revelstoke Generating Station, BC Hydro
Revelstoke GS

Project Type: Hydroelectric

Sequoia’s Role:
• Specification and installation instructions for a universal spare static exciter
• Control System Operation, Maintenance and Troubleshooting manuals
• Air gap monitoring system

__________________________________________


Mica Generating Station, BC Hydro
Mica GS

Project Type: Hydroelectric

Sequoia’s Role:
• Specification and installation instructions for a universal spare static exciter
• Air gap monitoring system

__________________________________________


Kootenay Canal Generating Station, BC Hydro
Kootenay Canal

Project Type: Hydroelectric

Sequoia’s Role:
• Specification and installation instructions for a universal spare static exciter
• Specification and project management for 230 kV 170 MVA unit transformer replacement

__________________________________________


Puntledge Generating Station, BC Hydro
Puntledge

Project Type: Hydroelectric

Sequoia’s Role:
• Design of the protection, alarm and metering panel
• River siren control system implemented in Delta V

• Fish screen control system modifications
• Trashrack monitoring system
• Automatic runback scheme modifications
• Supervisory interface design
• Improvements to the operation and design of the generating station with respect to public safety

__________________________________________


Hugh Keenleyside Navigation Lock, BC Hydro
Hugh Keenleyside Dam

Project Type: Hydroelectric

Sequoia’s Role:
• Wound rotor induction motor replacement with four 200 hp VFDs for hoisting operation
• Complete control system replacement with PLC-based control system

__________________________________________


Vancouver Island Terminal, BC Hydro
Vancouver Island Terminal

Project Type: Hydroelectric

Sequoia’s Role:
• Two 50MVar synchronous condenser control system upgrade to PLC-based control system (BC Hydro's first unit automation)
• Static exciter upgrade to two 50MVar synchronous condensers
• HVDC valve hall heating and ventilation PLC program

__________________________________________


Arnott Substation, BC Hydro
Arnott

Project Type: Hydroelectric

Sequoia’s Role:
• HVDC valve hall heating and ventilation PLC program
• HVDC maintenance support

__________________________________________


Ruskin Generating Station, BC Hydro
Ruskin Generating Station

Project Type: Hydroelectric

Sequoia’s Role:
• Protection, alarm and metering system replacement feasibility study
• Preliminary design of five radial spillway gate controls and associated power distribution

__________________________________________


Electric Power Research Institute (EPRI)

Project Type: Hydroelectric

Sequoia’s Role:
• Wrote Volume VII ('Protection and Control') of the 'Guidelines for Life Extension and Modernization of Hydro Plant' manual

__________________________________________


Dunsmuir Substation, BC Hydro

Project Type: Hydroelectric

Sequoia’s Role:
• Static VAR Compensator addition

__________________________________________


Fort Nelson Generating Station, BC Hydro

Project Type: Hydroelectric

Sequoia’s Role:
• Alsthom generator relay replacement with Schweitzer SEL-300G
__________________________________________


Keogh Generating Station, BC Hydro

Project Type: Hydroelectric

Sequoia’s Role:
• Gas turbine field flashing addition

__________________________________________


Strathcona Generating Station, BC Hydro
Strathcona Generating Station

Project Type: Hydroelectric


Sequoia’s Role:
• Feasibility study for synchronizing panel replacement